Case Studies Overview

  • Print this page
    Print this page
  • Remove Highlighting
    Remove Highlighting
  • Edit this Article
    Edit this Article
  • Export to PDF
    Export to PDF
There are a variety of case studies on the Engineered Software Website, with more being added.  These case studies were created for some of the most typical applications PIPE-FLO is called on to analyze.  

Pump Sizing - Selecting the proper pump is the most important step in the designing of a piping system. This case study provides instructions for using PIPE-FLO to select the best centrifugal pump.

Balancing the System - Often cooling and heating piping systems are not properly balanced to deliver the required flow rate to the various loads. Two things occur when this happens. 1. More fluid than is needed is pumped through the system, which increases pumping cost. 2. The extra flow through the various paths cannot be used for future system load expansion, which increases the capitol cost. This example shows how to use PIPE-FLO to balance a cooling system.

Problem Control Valves - Many times even the simplest piping system presents a large problem when it is not operating properly. In this example, we have a single pump circuit pumping from a supply tank to a pressurized tank. We will use PIPE-FLO to discover what can be done to correct a problem with a control valve. 

Finding System Bottlenecks - As process loads increase, additional fluid is pumped through the system. Without a clear picture of the entire piping system you can quickly pay a high price in pumping cost to get a small increase in flow rate. This study is based on an analysis of a reclaim water pump system at a nickel mining operation. You will see how a quickly modeling the piping system allowed the plant engineer to save over $250,000 per year in pumping costs.

Minimizing Pumping Cost - In this study we will see how calculating a pump's design point can improve the pump operation and minimize pumping cost. You will quickly see how important it is to re-evaluate a system when any changes are made.

Piping System Expansion - In this example, we will be adding four new banks of tools to the ultra pure water system in an integrated circuit manufacturing facility. You will see how to use PIPE-FLO's copy features to quickly add to an existing system. Once the changes have been made we will see their effect on the system operation.

Time Simulation with PIPE-FLO - It is often necessary to observe how a piping system operates over time. PIPE-FLO is a steady state hydraulic analysis program, and therefore is not designed to perform extended period simulation. However, there are a couple of options for extending PIPE-FLO's capabilities to include dynamic system analysis. In this example, you will see how to use the Lineup feature, and some simple calculations outside the program to perform some simple time simulation studies.

Time Simulation with Overtime - If you have Engineered Software's Overtime program, you can simulate any PIPE-FLO system's operation over an extended period of time. The Overtime program gives the user complete control over the duration and frequency of a time simulation. In addition, it allows for a dynamic analysis of even the most complex PIPE-FLO systems. In this example, you will see how to use Overtime in conjunction with PIPE-FLO to perform a time simulation.

Variable Speed Pumps - When designing piping systems in which the system demand varies (for example, a chilled water distribution system with varying loads throughout the year), variable speed pumps may be an effective energy and cost savings option. In these systems, the pump speed can be adjusted to meet the varying demands of the system. This article describes the implementation and operation of both fixed speed and variable speed pumps in PIPE-FLO and Flow of Fluids.

Using Overtime in Ship Deballasting Operation - One of our customers was working with a shipyard and was tasked with determining a method to pump out six ballast tanks on a ship while the ship's cargo was being loaded. The ship had to complete the deballasting operation within 12 hours to meet a tight schedule. This article shows how he was able to find a solution using PIPE-FLO Professional and Overtime.

There are links to these articles in the Related Articles section of this page.  They can also be access from the Engineered Software website.

Article Details

Last Updated
12th of April, 2010

Version
2005, 2007, 2009

Program
Overtime, PIPE-FLO Professional

Would you like to...

Print this page Print this page Email this page Email this page Remove Highlighting Remove Highlighting Edit this Article Export to PDF

User Opinions (0 votes)

No users have voted.

How would you rate this answer?



Thank you for rating this answer.

Visitor Comments

No visitor comments posted. Post a comment

Post a comment

To post a comment for this article, simply complete the form below. Fields marked with an asterisk are required.

Entering your email address is optional. It will not be displayed on this page, but may be used by our staff to contact you regarding your comment.

For technical support, please do not use this form. Use our Web Support Form or email solutions@eng-software.com, instead.

   Name:
   Email:
* Comment:
* Enter the code below: